-
Zero out coach requirements
Installed
All new filters for fluids and air
Synthetic engine oil change
Synthetic fluid for Allison
New tires
New shocks
All wheel alignment
New Upper Arms
New lower Arms
New Torque links
New Norgen valves steer compartment
New Norgen valve’s front level system
New Norgens Rear suspension
New caliper slide pins front caliper drive axle areas
New air brake lines all positions
New air bags all positions
New air hoses and compression fittings to air bags
New air brake relays
New red silicone bushing on all points using a bushing
Generator bay has soundown in boxes to be installed this week
New air bags on Belt tension system
New fuel filter for Aqua hot hot system
New fuel filter for generator
What an I missing to put bus on road?
Log in to reply.