Thought I would share pictures of the recent remodeling job done by Donnie Myers. We had our coach built in 2006. It was amazing how what was in then is out now. We were tired of polished brass, corian, keeping carpets clean, etc. We thought about trading for a new coach, but taking a 500k hit driving off the parking lot was not appealing. Further, it was amazing how much space is lost due to the Obama engine required now.
Our coach has been very carefully maintained and I knew it had good bones. We decided to make our current coach look like new on the inside and outside. We could not be happier with the result. Donnie’s in house decorator was invaluable in helping pull everything together.
Some of the things done include:
- Change the entry floor and install back lighting for glass tile
- Remove all tile and carpet. Run hardwood on diagonial throughout. Really opened space not have contrasting materials on the floor.
- Run floor heating throughout coach.
- Change out all appliances.
- Change all ceiling Halogen lights out to LED.
- Change laminate on all bay cabinets and facings.
- Changed out both windshields.
- Replace intercom system
- Change etched glass window between shower and bedroom to cracked glass,Replace house batteries.
- Change slide motors and locks to new technology
- New lamps and accessories.
- Re-upolster everything in the coach.
- Change all interior chades and exterior awnings.
- Remove every remnant of polished brass including shower enclousre. Replace with brushed nickol.
- Remove all countertops and window sills and replace with light weight granite.
- Change out the troublesome AMX system to the trouble free so far RTI system with i-pad intergration.
- Change both front and rear caps to the 2014 look.
- Change panels above wheels to the 2014 look
- Much more