-
1995-2018
Posted by Archived on February 23, 2018 at 10:58 amArchived replied 8 years, 6 months ago 1 Member · 2 Replies -
2 Replies
-
OK, so far we have updated the flooring, solid surface, part of the wall coverings, refrigerator, all the audio/video going back in with high def to all the tvs, induction cooktop, delete trash compactor and did drawer bank, took out the open toilet area and did a private toilet, new back up camera, did crestron control of the coach with IPADs, removed the kitchen table and did the bar type top LED lighting, and a few more things I am forgetting about on the interior….exterior is a whole other story..
Log in to reply.