-
Tim posted an update
Well I’ve made it through 90% of the bus…1 inverter changed, new rear tires, airbags, shocks, rebuilt the awning arms, new awning mounts, new awning motor, re wired the awning controls to a 3 switch system, level low repaired, new air compressor, 2 new 18k roof acs, 2 new ac compressors, new ac lines, new coach and chassis batteries, new windshields, 1 new side window, new dock lights (l and r) and changing the screen to a bluefire tablet. Still have a ways to go but getting there. Definitely a learning curve!!!
1 Comment-
Wow! Well done
-