-
Looking at a new Marathon being built
Spending some time at Marathon Factory I took some photo’s of what happens when a shell arrives at Marathon., they remove the slide and set it along side the bus.
Here’s a 2014 shell soon to be a 2015 double slide
Here’s the front slide
Generator install
Water bay drivers side, tanks, and Marathon air operated drop down door for electric and sewer lines (lower left corner)
Water bay bay passenger side, fresh water pump will be in bay. tanks in background
Another bus under production. Photo taken at entry, slide removed, ceiling build out
Log in to reply.