Hi Bob
I am still here. Not been able to work on the coach much becasue of having to make a living. One of my duh moments, I built my quiet box for the generator, got it all finished and realized as I was getting ready to mount the genny in it that it was 3 inches to short. Had to tear it out and start over. Been working on and off on it for the past 3 mos an hour ot two here or there. Just about to finish it, then on to finish the water/electric bay. Sent my electric reel in to glenndining and had them rebuild it. Cost me $150 plus $50 shipping but it is brand new now, so that is all I have to install in the water/electric bay. Got the interior window shades hung, ready to start building ceiling panels. Did the bedroom ceiling panels and wasn’t satisfied so tore them all out and starting over this winter when it is cold outside. If I could work 8 hrs per day on it I would be done in 6 mos or so.
Painful to go down to the shop, remember where I was, then think how it was I was going to do something, then start and 30-45 minutes later have to stop and not get back to it for 2-4 weeks. The critical things I make notes and leave them but still painful.
I saw your post on the lower bay door panels. Yes, Steve at IBP has those but local guy did a couple for me using the same SS and was less expensive partially due to shipping but used the same SS as Steve. They really are easy to replace, the real problem is finding the polished SS rivets. I found a stock of them at Bylers in Dallas, bought all he had and so have some spares for the future if I need them. I already ahd to use some of them to replace a lower panel from a rock that jumped out from the side road and hit the panel. The nerve of the rock doing that!!
Rob
91 XL 40
Missouri