Bob
You’re not alone though I understand how it must seem like it when we builders, don’t post. I have never posted much here, BCM or BNO and still don’t but I do read the site a least weekly. I agree, you can learn an awful lot from others posts. I just keep ploding along on my build. I travel for work at least 2-3 weeks per month so I don’t get much time to work on my conversion which explains why I have already spent 7 years working on it. I have spent the last 3 mos installing my aqua hot. I put the last thermostat wires in today and it feels great getting that thing done. It wasn’t hard work just time consuming pulling wires, making connections, etc. I am very particular about how my work looks and is constructed, so I spend alot of time thinking about it before doing it. When it isn’t to my satisfaction, I tear it out and do it again. Just my quirk, but I will only do this one time so I want it to be right.
I have the coach painted, the roof is raised/resided, heated marble flooring in, cabinets all built/stained/lacqured, SS is polished (not as good as I would like but to hot to work on it now-winter project) and most of the interior in. I once was told by an experienced builder from BCM that it takes about 15-20K man hours to put one of these things together. My experience is that would only be the amount of time actually doing the work. It takes me roughly an equal amount of time to figure out how to do something before I ever start it.
So, my friend, don’t fret, you’re not alone, some of us are just quietly trying to figure out how to eat the next bite of elephant and not choke on it!! I have been researching water and waste tanks for the past several weeks. I think I have it narrowed down to two tanks but for them and shipping it is almost $1600, which is way more than I want to spend on them. I could use some suggestions for a supplier locally as shipping for the two tanks is $450 of the $1600. The other thing I am stressing abut is the ceiling work. I am not an upholsteler and have never done anything like that so I went to a limosine company here locally today and the manager said I could hire two of his men to work after hours to put my ceiling treatment in for me. At that, he estimated it would be about $2000 labor over a week and about $2000 materials. Still thinking about that.
Rob
91 Prevost
Missouri