-
CNG Retrofit
I had a unique opportunity to sit beside a fellow on a flight recently who was a VP for Navistar Trucks. He told me that within the next two years they believe that 80% of the over the road truckers would be on dual fuel using CNG and they were putting up the clean energy fueling stations across the interstates now (@ Flying Js nationwide now).
Did a little research and found out that the operating costs for CNG runs about 40% of using diesel only. Start on diesel, then switch over to CNG. The payback on over the road guys was quoted to me as 7- 8 months. On our Prevost busses, that’s about $500 – $600 per fill up.
The retrofit kit consists of some composite tanks, a low pressure valve, a high pressure valve, a computer controller and an intake nozzle that feeds the intake side of the engine. I’ve seen prices all over the place for the conversion kits without the tanks so there’s a lot of research still to be done on that piece. The tanks are expensive. But as expensive as it sounds, the payback might not be too hard to justify.
While this is kind of a wild hair, makes we wonder if our friends at Prevost/Volvo aren’t already planning on offering the chassis with a dual fuel system in the very near future like the rest of the industry. Those city busses you see with the CNG stickers simply put a couple of the long tanks on top and put a little windscreen around them. I’ve even wondered if the setup already exists. Apparently there’s a number of different mounting solutions already being deployed for the over the road guys, so that doesn’t seem to be as big a problem as I would have imagined.
I don’t know if anybody else has interest in further investigation on this topic or if there’s more already in place than I have seen in my brief investigations.
Log in to reply.
